2000 project house: 1717 Baird Street
08/03/2000:
Roof shingles installed (95% complete).

08/05/2000:
Ridge vent, shingle caps, & flashing installed... roof complete. Soffet
vinyl begun. Vinyl trim (F/J channels) installed around windows, etc. Front
& back doors hung.

08/10/2000:
Soffet vinyl completed, porch forms made, electrical wiring started.

08/12/2000:
Vinyl siding installed (40% complete). Porches & front sidewalk poured on
08/11. Crawlspace insulation completed.

08/17/2000:
Electrical complete. Dirt moved in to form ramp from back door. Aluminum
placed on side soffets.

08/19/2000:
Wall insulation installed, 35% ceiling insulation installed.

08/24/2000:
Inside ceiling insulation completed. Vinyl siding begun on right side.

08/26/2000:
Preparation for construction of rear patio.
08/31/2000:
Forms constructed for pouring of rear patio & filled with gravel
|